Chongqing Gold M&E Equipment-Geological
|
Price: | 1.0 USD |
Payment Terms: | T/T,L/C,WU |
Place of Origin: | Chongqing, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
1. Specification
Drilling depth | m | 100 | 250 | 300 | 600 | ||||||
Drilling DI | mm | 300 | 200 | 150 | 75 | ||||||
Open hole DI | mm | 300 | |||||||||
End hole DI | mm | 75 | |||||||||
Drilling rod | mm | Φ60 | |||||||||
Drilling angle | 90°-65° | ||||||||||
Rotary Spindle | |||||||||||
Spindle forward speed | r/min | 30-1050 | |||||||||
Spindle reverse speed | r/min | 29-137 | |||||||||
Spindle stroke | mm | 560 | |||||||||
Spindle inner diameter | mm | 96 | |||||||||
Spindle lifting capacity | KN | 60 | |||||||||
Main Winch ( drive hydraulic system) | |||||||||||
Single line lifting speed | m/min | 0-45 | |||||||||
Hug floodgate belt width | mm | 90 | |||||||||
Tightrope diameter | mm | 14 | |||||||||
Hoist single line lifting capacity | KN | 40 | |||||||||
Roller diameter | mm | 200 | |||||||||
Roller cubic measure | m | 30 | |||||||||
Mud pump | |||||||||||
Horizontal Triplex BW-250 mud pump | |||||||||||
Displacement | L/min | 250 | |||||||||
Work pressure | Mpa | 7 | |||||||||
Water inlet caliber | mm | 75 | |||||||||
Water to exit caliber | mm | 50 | |||||||||
Gear Oil pump | |||||||||||
Duplex gear oil pump CBF-F63/25 | |||||||||||
Front displacement,pressure | 63mL/r 20Mpa | ||||||||||
Behind displacement,pressure | 25mL/r 20Mpa | ||||||||||
Drilling rig Power | |||||||||||
Diesel engine | Hp | 4100# 50HP | |||||||||
Electric motor | KW | Y180L-4 22KW |
Come to our factory and learn the usage of the advanced product is highly welcomed!
2. Products
(1) XYX-3 Triler-mounted Drilling Rig
Geology general check exploration,Earth physics exploration,Road and high layer building ground survey,Well,Blast opening et cetera drilling engineering
It is mainly suitable for drilling hard rock with diamond bit and PDC bit, and DTH drilling as well.